Landfill base liner; Construction of leachate storage ponds;Construction of the landfill road; Capping system; Construction of 12 test fields in order to compare different capping systems; Landfill operation planning
UGN® BEKOM H 10.0 → design, construction, installation, filtering material, commissioning
Hybrid filter module system eco 1000-ERM
UGN® BEKOM H 7.0 → design, construction, installation, filtering material, commissioning
UGN® BEKOM H 5.0 → design, construction, installation, filtering material, commissioning
UGN® BEKOM H 4.0 → design, construction, installation, filtering material, commissioning
UGN® BEKOM H 1.5 → design, construction, installation, filtering material, commissioning
UGN® BEKOM H 7.0 → design, construction, installation, filtering material, commissioning, maintenance